PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed metal furring at 2nd floor Elev. 5,6 Shear wall Facing North-East.jpg Installed sheathing around the perimeter of the low roof Facing North-West.jpg Installing copper piping at the 2nd floor bathrooms.jpg Installing copper piping at the 3rd floor bathrooms Facing West.jpg Laying out block at Break Room 131 Facing North-West.jpg Setting the door frame at the Sally port Entrance (West Elevation).jpg
Previous pageNext page Laying out block at Break Room 131 Facing North-West
Laying out block at Break Room 131 Facing North-West